Enter the details below to estimate the approximate material requirements and total cost of your structure.

Make sure the pricing table

Material NameBulk TypeQuantityBulk PricePer unit
CementBag112801280
SandTrack (Cubic foot)5003000060
Steel per tonTon (KG)1000230000230
Aggregate (Crush)Tractor (Cubic foot)125650052
BricksTruck1100019800018
Door Frames 5 InchRunning foot1270270
Door Frames 10 InchRunning foot1400400
Labor FoundationSq. Ft.13232
Labor StractureSq. Ft.1170170
Plaster LaborSq. Ft.11616
StoneTrack (Cubic foot)125380030.4
ShingalTrack (Cubic foot)125450036
(TablePress) with a “Per Unit” column is on this page.

Note: The above results are estimated for structure work only (DPC to slab). Actual quantities may vary based on on-site conditions, material wastage, and structural design.
Need a detailed cost breakdown or on-site supervision?
Contact AH Construction Management — we offer complete construction management services on material percentage and supervision basis.
Material NameBulk TypeQuantityBulk PricePer unit
CementBag112801280
SandTrack (Cubic foot)5003000060
Steel per tonTon (KG)1000230000230
Aggregate (Crush)Tractor (Cubic foot)125650052
BricksTruck1100019800018
Door Frames 5 InchRunning foot1270270
Door Frames 10 InchRunning foot1400400
Labor FoundationSq. Ft.13232
Labor StractureSq. Ft.1170170
Plaster LaborSq. Ft.11616
StoneTrack (Cubic foot)125380030.4
ShingalTrack (Cubic foot)125450036